MPC is used to optimize control inputs by approximating a reference trajectory using dt, N and T variables in a finite(2-3 seconds) time-horizon. This reference trajectory should encompass very small values of dt which will be multiplied by N (should be a number that when multiplied by dt is 2-3Continue Reading